It’s Done

BridgeWorkA

There wasn’t a cloud in the sky all day. By early afternoon the new bridge was done. The most time consuming part was pounding out the nails on the lateral boards. We recycled the boards left when we removed an old deck. With the bridge complete, the chickens, dog, and us have an easy walk to the other side. The bridge is 1.5 meters (4 feet 11 inches) wide and 3.65 meters (12 feet) long.

MapleLeaves
BridgeWorkB
BridgeWorkC

This entry was posted in Happiness. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s